Lilydale Heights College Redevelopment Stage Three
FIMMA completed this major upgrade and modernisation project at Lilydale Heights College, representing Stage 3 of the campus redevelopment. Funded through a 2020-21 State Budget allocation, and as part of the Lilydale and Upper Yarra Education Plan, the upgrade works provide staff and students with new and upgraded facilities for STEAM studies. The scope of work required delivery over two stages.
Separable portion one involved an initial demolition and strip out of the North section of an existing Arts & Technology Building (E-Wing). This was followed by delivery of a new fit-out, including ICT labs, flexible learning spaces, digital maker classrooms with 3D printers, machine room (including high tech CNC capability), design and collaboration classrooms, laptop stations, student breakout and locker areas, staff offices, upgraded store/comms room, and staff amenities.
Separable portion two required demolition of the existing B Wing Building. Construction of a new Science & Maths building then commenced, featuring home economics classrooms, dry goods and prep store, cafe and dining area, science labs with linked preparation and storage areas, general-purpose classrooms, breakout spaces, staff offices and student amenities. A substantial landscaped area with elaborate brick paving, concrete pathways, and native flora was also delivered, creating new outdoor learning and gathering spaces, which are now a key feature of the campus.
Delivery of the works required close communication with both School representatives and other contractors already on-site to minimise our impact on campus activities as much as possible.